In the 2015-2016 school year, my Sci-Vis class was working through a marathon of 3ds max assignments, from Mr B. I did not effectively plan my time, and as a result, I ended up behind schedule, and did not Finnish. had I planned my time, I would have known that I would need all of my time to work.
After reading the two articles, I found that what particularly stuck with me was "work with the team". I have noticed that in the past, everyone in the group wanted to be the leader, and nobody got anything done.
0 Comments
|